Category
Welfare units
A mess area, a separate WC and a heated drying area on one braked chassis, towed to site and moved again when the job moves.
Specified for a crew and a shift pattern, not for a floor area.

The duty behind it
What the law requires this unit to contain
On a construction site in Great Britain the welfare facilities are not a preference, they are Schedule 2 of the Construction (Design and Management) Regulations 2015, and the duty falls on the client, the principal contractor and each contractor at once. It is written in terms of function rather than size, which is why two units of the same length can sit on opposite sides of it.
All twenty four requirements, with the paragraph named and the source dated
| Paragraph 1, sanitary conveniences | A separate compartment with its own lockable door, mechanically extracted and lit. |
|---|---|
| Paragraph 2, washing facilities | A basin in the immediate vicinity of the WC, with hot and cold or warm running water, soap and a means of drying. |
| Paragraph 3, drinking water | Potable grade tank, pipework and fittings throughout. A unit plumbed with non-potable fittings cannot discharge this whatever goes in the tank. |
| Paragraph 4, changing and lockers | The heated drying area, hanging space, seating and lockable storage. |
| Paragraph 5, rest | Seating with backs, which is explicit in the instrument, counted against the break headcount rather than the site headcount, with a means of boiling water and somewhere to prepare and eat. |
From compact to flagship
Units in this category
Welfare 300
10 ft site welfare unit: mess area seating 5 to 6, a separate WC, and a heated drying area on one braked chassis.

Welfare 360
12 ft site welfare unit: mess area seating 6 to 8, a separate WC, and a heated drying area on one braked chassis.

Welfare 420
14 ft site welfare unit: mess area seating 8 to 10, a separate WC, and a heated drying area on one braked chassis.
The range
Every sanitation unit
Welfare 300
10 ft site welfare unit: mess area seating 5 to 6, a separate WC, and a heated drying area on one braked chassis.

Welfare 360
12 ft site welfare unit: mess area seating 6 to 8, a separate WC, and a heated drying area on one braked chassis.

Welfare 420
14 ft site welfare unit: mess area seating 8 to 10, a separate WC, and a heated drying area on one braked chassis.
A welfare unit is bought by the people who have to satisfy a duty rather than by somebody choosing a product. On a construction site in Great Britain that duty is Schedule 2 of the CDM Regulations, and it is written in terms of function rather than size, which is why two units of the same length can sit on opposite sides of it.
So the specification starts from the number who sit down at break and the shift pattern, and the chassis and the panel are settled before the fit out is. A unit handed to a different crew every fortnight is judged on what survives that, which is decided at the frame rather than at the worktop.

Configure a welfare unit
Menu, volume and market in, a reviewable specification out. A person then quotes it for your country.








